[100% off] LSSBB Lean Six Sigma Black Belt Certified Practice Exam

Course Instructor: Wings Info Tech

Language: English


Description:

Sample Questions:

The primary goal is to improve the removal of waste water Order season, where the time _________________ during the time the payment is packed.

shift start

Research and development

Upon receipt of the order

new financial year

None

Belt rearranged for the location of the inventory component rework station for locating used parts most often are up to your fingertips repair person. This rearrangement of result edin faster repair times by eliminating one of the seven most important factors in waste, which is waste of

movement

transport

inventory

Waiting

None

What best describes the elements of Waste “unnecessary movement of materials and goods”?

over Processing

inventory

movement

transport

None

The waste of overproduction is defined as ______________________.

Unnecessary people and equipment

Liability materials are bought and placed immediately sold or used

Producing more than the needs of the next step, or more than the customer buys

Excess movement of material

None

English words are used in 5S are __________, _____________, Shining, Standardizing and maintaining. (Note: There are 2 correct answers).

Adaptation

separation

transition

straightening

Appropriate measures mean that the measurements are ______________.

Representative

sufficient

context

relevant

All of these answers are correct

What factors Measurement Systems Analysis (MSA) studies are applicable to the process used to measure does not damage the part?

Destructive variable Gage R & R Study and crossed the

Destructive variable Gage R & R Study and nested

Nondestructive variable Gage R & R Study and crossed the

Nondestructive variable Gage R & R Study and nested

None

Who this course is for:

  • Those who want to get knowledge on Certification & Check your Skill Test while attend this Practice Test

Enroll Now

Leave a Comment